RF · EMC · OTA · LAB SOLUTIONS

From Laboratory to Test System, One Complete Solution

We provide 5G RF, EMC and OTA testing, microwave chamber construction, instrument configuration and system integration for wireless, automotive, consumer and industrial electronics R&D.

Starting from standards, frequency range, DUT and laboratory conditions, we turn complex requirements into implementable, verifiable and maintainable engineering solutions.

Test Requirement AnalysisSystem Configuration DesignLaboratory ConstructionIntegration and Validation
电波暗室与EMC Testing Environment

Anechoic Chamber / EMC Test Environment

WHAT WE DO

We Deliver the Test Solution, Not Just Individual Equipment

A successful test project depends on the fit between the laboratory, instruments, RF accessories, software control and standards. Our system approach reduces duplicate purchasing, configuration errors and rework.

Start with Requirements

Define the product, frequency range, standards, test items, accuracy and future expansion before selecting the architecture and equipment.

Start with the System

Consider the chamber, antennas, cables, amplifiers, switch matrix, sources, analyzers and automation software as one system.

Plan for Long-Term Use

Plan for maintainability, calibration, upgrades and daily efficiency so the laboratory remains useful over time.

SOLUTIONS

Core Test Solutions

We provide solutions from individual instrument configurations to complete laboratories for different DUTs and standards.

5G RF Conformance Testing System

5G / RF Conformance Test System

01 · 5G / NR RF TEST

5G RF Test Solutions

For terminals, communication modules, RF front ends and base-station products, we design complete RF chains for Sub-6 GHz, millimeter-wave and multi-port testing.

The solution can cover signal generation, spectrum analysis, power, EVM, ACLR, spurious, RF switching, attenuation control and automation, configured for throughput and future expansion.

  • Vector Signal Generation and Analysis
  • Spectrum and Spurious Testing
  • Power / EVM / ACLR
  • Multi-Port RF Switching
  • Automated Test Control
  • Existing Platform Upgrade

02 · EMC / EMI

EMC Testing and Pre-Compliance

We plan EMI receivers, spectrum analyzers, LISNs, CDNs, antennas, amplifiers and test spaces for radiated/conducted emissions and immunity tests.

A lightweight EMC pre-compliance environment helps engineers locate interference and verify corrective actions before certification, reducing repeated lab submissions.

  • Radiated Emission
  • Conducted Emission
  • Radiated Immunity
  • Conducted Immunity
  • EMC Pre-Compliance Laboratory
  • EMI Troubleshooting Environment
EMC半电波暗室TestingEnvironment

EMC Semi-Anechoic Test Environment

Microwave Anechoic Chamber和电波暗室

Anechoic Chamber / RF Shielded Room

03 · ANECHOIC CHAMBER

Microwave and Anechoic Chamber Construction

We plan chamber structure, absorbers, shielding, turntables, antenna masts, monitoring, lighting and interfaces based on frequency, test distance, quiet-zone size, DUT dimensions and site conditions.

For chamber projects, we focus on the actual testing capability after completion. During the solution phase, we plan the chamber, instrument system, RF path and test methods together to avoid rebuilding the test system after the room is finished。

  • Fully / Semi-Anechoic Chamber
  • Microwave Anechoic Chamber
  • OTA Test Chamber
  • Shielded Room and Absorber Layout
  • Turntable and Antenna Mast
  • Performance Verification and Commissioning

04 · TEST SYSTEM INTEGRATION

Instrument Configuration and System Integration

We select signal generators, spectrum analyzers, network analyzers, power meters, EMI receivers, amplifiers, switch matrices and RF accessories according to the test requirements, then calculate frequency range, power margin, loss, dynamic range and control interfaces as one system。

If you already own instruments, we assess the existing equipment, identify what can remain and what needs upgrading, and rebuild a complete test path through accessories and software。

  • Instrument Selection
  • BOM Configuration
  • RF Accessories and Cables
  • Control Interface Planning
  • Automated Test Software
  • System Calibration and Verification
射频TestingInstrument和AutomationTesting机柜

RF Instruments / Automated Test Rack

ENGINEERING

Resolve Test Risks During Design

Late-stage problems often result from a lack of system-level design, rather than poor equipment performance.

Common Problems Come from System Mismatch

During the solution phase we check the match between the test path, site, instruments and standards, so risks are found before procurement, construction and system integration。

Individual equipment parameters are sufficient, but the complete system cannot meet the test requirements

问题可能来自线缆损耗、功放余量、噪底、动态范围、连接器以及射频开关矩阵损耗,没有进行完整的链路预算。

The chamber is complete, but its testing capability does not match the target frequency band

静区、Testing距离、吸波Materials、Antenna位置与实际被测对象没有统一考虑,会导致后续增加大量整改工作。

The testing process relies heavily on manual work, reducing efficiency and increasing errors

如果前期没有规划远程控制、自动切换、Data采集与Testing软件,后期再增加Automation功能通常会明显提高集成难度。

01

Requirement Analysis

Confirm product type, test standards, frequency range, test items, performance targets, site conditions and future expansion needs。

02

System Design

Complete the test system block diagram, laboratory layout, instrument configuration, RF path, accessory selection and control architecture。

03

Technical and Budget Review

Balance testing performance, procurement budget, project schedule, maintenance cost and future upgrade capacity。

04

Implementation and Integration

Complete equipment installation, RF cabling, control connections, software commissioning, system calibration and reference-unit test verification。

05

Delivery and Ongoing Support

Provide test procedures, operator training and documentation, with an upgrade path for new products, bands and standards。

INDUSTRIES

Suitable for Many Wireless and Electronic Product Tests

Different products require different tests; we redefine test boundaries and system architecture for each DUT.

5G / Wireless TerminalsSmartphone · CPE · IoT

Communication ModulesRF Module · Board

Automotive ElectronicsV2X · Radar · ECU

Consumer ElectronicsWearable · Smart Device

Industrial ElectronicsIndustrial · Control

Antennas and RF ComponentsAntenna · RF Component

PROJECT CASE

5G Wireless Terminal OTA Test Laboratory

From Requirements to Laboratory Deployment

暗室Test Items案例

OTA / EMC Laboratory Project Example

CASE EXAMPLE · OTA / 5G

OTA Test System in Limited Laboratory Space

客户计划为 5G 无线终端、Communication Modules及 IoT 产品建立一套研发型 OTA TestingSystem,用于产品研发阶段的无线Performance评估。项目需要兼顾现有实验室空间,同时考虑后续新增产品和Testing频段的扩展需求。 根据客户的产品Dimensions、目标频段、Testing距离及Test Items,我们对暗室结构、静区范围、吸波Materials、Turntable、TestingAntenna、射频链路和InstrumentSystem进行了整体规划,并将TestingEquipment、运动控制及Data采集纳入统一的System架构。

在Instrument配置方面,根据Testing需求规划通信Testing仪、频谱/信号分析Equipment、射频开关及相关附件,并对整个 RF 链路的损耗和Testing路径进行设计。通过Automation控制,实现Turntable、Antenna、Instrument与Testing流程之间的协同。 最终形成一套从暗室Environment → DUT → AntennaSystem → RF 链路 → TestingInstrument → Automation软件完整连接的 OTA Testing平台,使客户能够在自己的实验室内开展日常研发验证,并为未来Testing能力升级预留空间。

Chamber PlanningDesign Around DUT Size, Frequency and Test Distance
RF SystemConfigure Instruments, Antennas, Cables and RF Chain
AutomationTurntable and Instrument Control with Automatic Data Collection
ScalabilityReserve Upgrade Capacity for New Products, Bands and Test Items

CONTACT US

Tell Us About Your Test Requirements

For 5G RF testing, EMC laboratories, microwave anechoic chambers, instrument configuration or system upgrades, contact us by phone, email or online message. The more complete your test information, the faster we can provide a targeted preliminary solution。

Contact Us Directly

For urgent projects, call us directly. You can also email your product type, test standards, frequency range and existing equipment。

Call Us Directly

Project Inquiry

Provide your basic information and test requirements so we can make an initial assessment and follow up.

The form uses standard HTML POST structure. After importing it into PHP, set the form action to your existing message endpoint。

Before launch, replace the company name, phone number, email and form submission address with your real information。